Project Details
Year: 1994
General contractor: Sintra inc.
Sub-contractor – concrete: DEMIX Construction
Plans, specs, concept: Ministry of Transportation (MTQ)
Client: Province of Quebec
Concrete Slab Data
Area: 65,200 m2
Thickness: 250 mm Volume: 16,300 m3
28-day strength: Compressive: 35 MPa Flexural: 4.5 MPa
Longitudinal joints: 15M tie-bars at 750 mm oc
Transverse joints: 38 mm Ø dowels
Joint spacing: 5 m
Sealant type: Hot-pour and silicone
Curing: Curing compound
Cement used: Type MS - BA
Aggregate: 5–20 mm
Other Technical Data
Base: 800 mm
Sub-base: 600 mm
Upper base: 200 mm, 0–20
Drainage: Geocomposite pavement drain
Characteristics
• Experimental section (test slab) for placement and sealing
• Astroturf drag surface texture